Lost Valley Trail Maintenance Working Vacation

Lost Valley Trail Maint. Working Vacation

Los Padres Forest Association        

April 8th – April 17th 2016

 

Trip Purpose – The main purpose of this trip was to perform brushing and tread-work in the areas heavily covered in brush. Remove debris slides and cut out and remove the estimated 10 downed trees blocking the Lost Valley Trail from the lower trailhead starting at the Lost Valley/Manzana trail intersection and ending at the Hurricane Deck trail intersection. This trail took heavy debris damage during the August 2015 thunderstorms.

Water Conditions – Water conditions were about as expected considering 5 years of drought. The creek bed had some wet areas in the lower 2 miles. The dependable wet area, ¾ miles below twin oaks, was wet and vulture springs was trickling. Packers brought us water for camp every other day or so.

Weather Conditions – We experienced rain the first 3 days of the project and stayed at NIRA, then moved camp to Twin Oaks and finished the project from there. The remaining 7 days were mostly clear with highs in the high 70’s and low 80’s.

Description of Work/Surveys Accomplished

Project Overview

  1. Bucked out 10 fallen trees along the entire Lost Valley Trail.
  2. With the total length of the Lost Valley Trail being about 8 miles, we cleared the first 5 miles to Vulture Springs to full LPFA standard. We also completely cleared the remaining 3 miles from Vulture Springs to hurricane deck of all trees and heavy brushing and worked on tread areas in problem spots.

Trip Overview – This 10-day working vacation was originally planned for the Madulce Trail. However, rainy weather during the first few days, caused concern for getting pack animals safely in and out of camp and up the infamous heartbreak hill.

So we moved the project to the Lost Valley Trail, which sustained heavy damage during the August 2015 thunderstorms. That particular weather event brought down trees and debris slides, making the trail nearly impassable to hikers.

We car-camped the first 3 days of the project at NIRA while working on the first few miles of the Lost Valley Trail. After the weather cleared, and the remaining work was farther up the trail, we moved to Twin Oaks Camp to continue our efforts.

The trip was very successful overall, especially as an alternate to the original plan. Each day we broke into several teams, performing brushing, tread-work and/or tree removal as needed.

Future Projects for the area – The remaining 3 miles, from Vulture springs to hurricane deck, need to be completed to Full LPFA standard. A multi-day trip, with workers staying at cowboy camp and packers bringing water to camp, will make working this section feasible. This will allow us to work on the East Hurricane deck section simultaneously.

Backcountry users observed in the area – We observed several groups of day-hikers and backpackers in the Manzana trail and NIRA camp areas. On the final day of the project, a couple of backpackers who hiked the middle-deck loop mentioned that they were very pleased to hike a freshly worked Lost Valley Trail.